Free engineering tool
OEE Calculator
Calculate Overall Equipment Effectiveness from shift length, downtime, ideal cycle time and counts, and find which loss costs you the most production.
Breakdowns, changeovers, material waits.
OEE80.2%
Availability90%405 of 450 min running
Performance93.8%380 of 405 possible in run time
Quality95%361 good units
| Loss | Minutes | Units lost |
|---|---|---|
| Availability loss (downtime) (largest) | 45 | 45 |
| Performance loss (slow cycles, small stops) | 25 | 25 |
| Quality loss (rejects and rework) | 19 | 19 |
| Fully productive time | 361 | 361 of 450 ideal |
OEE = Availability × Performance × Quality. Planned production time = shift length − planned stops.
What is OEE?
Overall Equipment Effectiveness (OEE) measures how much of the planned production time is truly productive: making good parts, as fast as possible, with no stops. It combines three factors:
OEE = Availability × Performance × Quality
Availability = Run Time ÷ Planned Production Time
Performance = (Ideal Cycle Time × Total Count) ÷ Run Time
Quality = Good Count ÷ Total Count Worked example
An 8-hour shift (480 min) has 30 minutes of planned breaks, so planned production time is 450 minutes. The line stops for 45 minutes, leaving 405 minutes of run time. The ideal cycle time is 60 seconds, and the line makes 380 units, of which 19 are rejected.
- Availability = 405 ÷ 450 = 90.0%
- Performance = (60 s × 380) ÷ (405 × 60 s) = 93.8%
- Quality = 361 ÷ 380 = 95.0%
- OEE = 0.900 × 0.938 × 0.950 ≈ 80.2%
The six big losses
| OEE factor | Typical losses |
|---|---|
| Availability | Equipment failures; setups and changeovers |
| Performance | Idling and minor stops; reduced speed |
| Quality | Process defects; startup rejects |
Tips for accurate OEE
- Use the true ideal cycle time, the fastest the equipment can run sustainably, not the average or standard rate. If performance comes out above 100%, the ideal cycle time is set too slow.
- Be consistent about planned stops. Decide what counts as planned (breaks, planned maintenance) and apply it the same way on every line.
- Count changeovers as downtime so improvement work on setup time shows up in the number.
- Capture data automatically from PLCs or an MES where possible; manual logs usually under-report short stops.
- Track the three factors, not just the total. The breakdown tells you where to focus.